Search Your Paper

Showing posts with label Civil Engineering 4. Show all posts
Showing posts with label Civil Engineering 4. Show all posts

Tuesday, April 25, 2017

Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/5108/
                                                             
Duration 3 Hrs.
1.     Fill in the blanks
a.     Copper sulphate treatment is done to destroy _____ from water.
b.     MPN is related with bacterial _______
c.      Qdour  test may be carried by an instrument called ______
d.     Turbidity is imported by the ____ matter present in water
e.      The purpose of sedimentation is to remove the ________ impurities.
f.       In galvanizing process ________ coating is applied to the metal.
g.     Method of water distribution depends upon the ________ of the metal.
h.     Method of water distribution depends upon the _______ of the area.
i.       Population control board in India was created in the year _______
j.       Normal does of aluminum sulphate as  coagulant is ______ mg/litre
k.     From septic tank the effluents are discharged into _______
Section –B
Note : Attempt any five questions
2.       
a.     Ground water sources and sub surface sources.
b.     Porous pipe galleries and infiltration galleries.
c.      River intakes and canal intakes.
d.     Suspended impurities and dissolved impurities.
e.      Combined system and separate system of sewerage
f.       Earth privy and pit privy.
g.     Cleaning of sewers and flushing of sewers.
Section-C
Note : Attempt  any four questions
3.     Name various methods of forecasting population with formulae and explain any one.
4.     What are the factors on which source of water supply depends? Explain any one.
5.     What is sedimentation? Give advantages of plain sedimentation.
6.     Define break point chlorination and give its advantages.]
7.     Describe break  the advantages and disadvantages of plastic pipes.
8.     What are the purpose of sewer ventilation? Describe the method of sewer ventilation.
9.     Enlist various factors helping self-purification of stream. Define dilution factor.
Section –D
Note : Attempt any three questions
10.                         
a.     Enlist different types of pipe joints. Describe with neat sketches spigot and socket joint and flagged joint.
b.     Mention the various sewer appurtenances also state the location and utility of each.
c.      What are different privies used of disposal of human excreta in rural area? Explain any three commonly used.
d.     What is water meter? Give requirements of good water mete. Enlist various types of water meter and explain any  one with neat sketch.

e.      Explain sewage sickness. Describe briefly any three tests for home drainage.

Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/4451/May’10
                                                             
Duration 3 Hrs.
1.     Fill in the blanks
a.     The field of a well depends mainly upon ______
b.     The cleaning of slow sand fitter is done by ______
c.      AGI pipe has a coating of _______
d.     Chlorination of water is done for _______
e.      Water supply scheme is usually designed for a period of ______
f.       pH value of fresh sewage is expected to be _______
g.     the minimum diameter of server pipe is _______
h.     the gas that is mainly responsible for explosion in sewer is ______
i.       The septic tank should be cleared at regular interval but should not exceed ________
j.       Traps are used in household drainage system to _____
State true or false
k.     Sewage consists of water only and solid matter is hardly present.
l.       The colour of water is measured on well scale.
m.  The aim of disinfection is to kill all the microorganism in water.
n.     Water meter is used to measure the quantity of sewage
o.     Trickling fitters remove  organic matter.
Section –B
Not e: Attempt any ten questions
2.       
a.     List out the factors affecting per capita demand.
b.     Explain about quality and quantity of surface water.
c.      Give the chemical standards of water used for domestic purpose
d.     Explain the functions of sedimentation.
e.      Explain advantages and disadvantages of concrete pipe.
f.       Explain lowering of pipe i.e. water supply pipe into the trench
g.     List out the various fixture used in internal water supply
h.     Explain self cleaning velocity.
i.       Explain advantages and disadvantages of combined system.
j.       Explain sewage sickness.
k.     Explain advantages of tricking fitters.
l.        Explain the aims of building drainage.
Section – C
Note : Attempt any three question
3.       
a.     Explain arithmetic increase method with example
b.     Explain infiltration wells with neat sketch.
4.      
a.     Compare slow sand filter and rapid sand fitter
b.      Explain briefly grid iron distribution system.
5.       
a.     Explain the factors affecting dry weather flow.
b.     Explain manholes, it subjects and location .
6.       
a.     Explain disposal sewage by land treatment
b.     Explain the points should be kept  in mind for house drainage
c.      Explain objectives of screens



Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/4451/May’09
                                                             
Duration 3 Hrs.
1.     Fill in the blanks
a.     The demand of water will be ______ if the population increases.
b.     Coagulation is needed when the size of the  particle is ______
c.      Slow and fillers requires _______ area
d.     Minimum cover for a water supply pipe line should be ______
e.      Units of turbidly are ______
f.       BOD is measure to find out the _______ of sewage
g.     Screens are usually laid at an angle of ______
h.     The pipe installed for ventilation purposes is called ________
i.       European style water closet is also  called ______
j.       The sedimentation tanks located just after the grit chamber are called _______ clarifiers.
State true or false
k.      Contaminated water is used for drinking purpose.
l.       The physical impurities give taste , odour, colour and libidlity.
m.  G.I pipers are used for service connections
n.     Anaerobic bacteria exist  in the  absence of oxygen.
o.     The leakage of sewage from the sewer into the soil is called infiltration.
Section –B
Note : Attempt any ten questions
2.       
a.     What do you mean by pet capita demand?
b.     How the bedding for a pipe line should be made?
c.      What do you mean by limiting velocity.
d.     Define back falling.
e.      Define chlorination and chorine demand.
f.       What are various joint sin pipes? Explain
g.     Draw a plan of a building and show on it the line diagram indicating water supply connections.
h.     What is the difference between sewage and sullage.
i.       What do you mean by handling of sewers.
j.       Differentiate between separate and combined sewerage system.
k.     Differentiate between conservancy and carriage system.
l.       What do you mean by gully trap and why it is provided?
Section-C
Note : Attempt any three questions
3.       
a.     What are the advantages and disadvantages of intermittent system of water supply.
b.     Explain various water supply distribution methods.
4.     Describe the construction, working principle and operation of rapid sand filter.
5.     What is bulling drainage? Write in detail the requirement of an efficient building drainage
6.     What are various sewer appurtenances used in a sewerage system and state the location.

    

Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/5165/May’08
                                                             
Duration 3 Hrs.
1.     Choose the correct one
a.     The valve provided at all dead ends in the distribution system & at all depressions is
                                                             i.      Safety valve
                                                           ii.      Sluice valve
                                                        iii.      Scour valve
                                                        iv.      Float valve
b.     The pH value of neutral water is
                                                             i.      5.0
                                                           ii.      6.0
                                                        iii.      7.0
                                                        iv.      8.0
c.      The pipe through the water main to building is
                                                             i.      Water service pipe
                                                           ii.      Soil pipe
                                                        iii.      Waste pipe
                                                        iv.      Vent pipe
d.     Which of the followings is an hydraulic element of a sewer
                                                             i.      Dameter
                                                           ii.      velocity
                                                        iii.      slope
                                                        iv.      all of the above
state true or false.
a.     Pipe which carries sewage is called sewer.
b.     Anaerobic bacteria act in the presence of oxygen
c.      Recirculation is canaries out in trickling filter.
d.     Maximum daily demand is less than average daily demand
e.      Algae produces colour and odour in water
Fill in the blanks
a.     The unit of hardness is _____
b.     Pipe used in building is _______ pipe.
c.      Sedimentation removes _______
d.     Oxidation is the addition of oxygen or removal of _______   
e.      BOD stands for _______
Section –B
Note : Attempt any ten questions
2.      
a.     What is conservancy system of sanitation ?
b.     What are maximum and minimum velocities of sewers?
c.      Give the locations  & functions of a manhole
d.      Explain a collar joint.
e.      What is a seal? How it gets broken?
f.       Explain self purification of stream.
g.     Write per capita consumption of various demands of water as per BIS standards.
h.     What are sub surface water sources.
i.       What is standards plate count test?
j.       How pipe lines are tested?
k.     What are water supply fixtures ?
l.       Explain hardness of water
Section-C
Note : Attempt any three questions.
3.     Define coagulation. Explain different types of coagulates used
4.     Explain different methods of layout of distribution pipes
5.     Explain the construction and working o tricking filter.
6.     Explain the methods of sludge digestion and sludge disposal



Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/5108/May’08
                                                             
Duration 3 Hrs.
1.     Fill in the blanks.
a.     In India water consumption per capita per day is ______ liters for domestic use
b.     Sub surface water is free from____
c.      Alum is used for _________
d.     Turbidity is due to ________ impurities.
e.      GI pipes are used for ______
f.       Sewerage is _______ waste of the community.
g.     Dry weather flow is also called ________
h.     Masonry sewers are  used for ______ sizes.
i.       In India, generally _________ sewerage system is used.
j.       The pope installed for ventilation purpose is called _______
State true or false.
k.     The privy pit should not be closed with sullage  
l.       Night soil means human excretes.
m.  Aerobic bacteria exist in the presence of light.
n.     The treatment , which works on the Principe of biological , is called primary treatment.
o.     Bonding rod is used for checking the gradient of sewer
Note : attempt any ten questions
2.              
a.     What do you mean by per capita demand?
b.     What is breakpoint chlorinates?
c.      When water  said to be potable?
d.     Differentiate between domestic sewage and industrial sewage
e.      Explain D.W.F
f.       Differentiate between infiltrates and galleries
g.     Write importance of B.O.D
h.     What is the difference between sulage and sewage ?
i.       What do you mean by gully trap and why it is provided?
j.       What is back filling?
k.     Why cesspool is preferred?
l.       What is the importance testing a sewer?
Note : Attempt any three questions
3.     Define the various types of impurities in water and discuss their effects.
4.     What do you mean continuous and intermittent supply system of water? Compare both the systems with respect to their merits and demerits
5.     Differentiate between a separate system and a combined system of sewage along with their advantages and disadvantages.
6.     Explain activated sludge by drawing a flow diagram along with merits and demerits of the system.  



Roll No­­­­­­­­­_________
WATER SUPPLY AND WASTE WATER ENGINEERING
4th Exam /Civil/5165/Dec 07
                                                             
Duration 3 Hrs.
Section –A
1.     Choose the correct one
a.     Any trap is intended to trap
                                                             i.      Water
                                                           ii.      Sewage of sullage
                                                        iii.      Any liquid waste
                                                        iv.      Foul gases
b.     Disinfection is the process of
                                                             i.      Killing all bacteria
                                                           ii.      Killing only pathogenic bacteria
                                                        iii.      Removal of causative organism for disease
                                                        iv.      Complete destruction of life
c.      A water born disease is
                                                             i.      Malaria
                                                           ii.      Cancer
                                                        iii.      Dysentery
                                                        iv.      Encephalitis
d.     A sewer that collects sewage from toilet is called.
                                                             i.      Lateral
                                                           ii.      Branch sewar
                                                        iii.      Main sewar
                                                        iv.      Outfall sewar
e.      The pipe in building through which human excreta flows is called.
                                                             i.      Soil pipe
                                                           ii.      Waste pipe
                                                        iii.      Vent pipe
                                                        iv.      None of these
State true or false:
a.     P H value of drinking water should be more than 8,
b.     Kitchen waste is sullage.
c.      Slow sand filters require less area
d.     BOD of safe drinking water must be nil.
Masonry sewers are used for small sizes.
          Fill in the blanks:
a.     The process of supporting the sides of trenches by wooden members is the termed as ______
b.     Alum is used for ______
c.      Units of turbidity are ______
d.     A sewer, which receives storm water, surface run- off and sewage , is called ______ sewer.
e.      Sluice valve is provided to ________ the flow of water through the pipe.
Section-B
Note : Attempt any ten questions
a.     What do you mean by the term per capita demand?
b.     What do you mean by MPN?
c.      What is break point chlorination  ?
d.     Differentiate between arithmetic and geometrical methods of for casting the population.
e.      What is the purpose of filtration?
f.       When water is said to be potable?
g.     Differentiate between DWF and Storm sewage
h.     Define the separate system of sewerage
i.       What is the self cleansing velocity?
j.       Define aerobic conditions.
k.     What is antisyphonage pipe?
Section-C
Note : Attempt any three questions
2.     Explain the different methods of sewage disposal
3.     Explain in brief the ring system of water distribution
4.     Define the various types of impurities in water and discuss their effects

5.     Explain the steps involved in activated sludge proceses.    

Popular

Archive

North India Campus. Powered by Blogger.

Welcome to North India Campus

Search Question Paper

Labels

1ST Semester M.SC IT(D) 1ST Semester MBA 1st & 2nd Semester BE 1st Semester B.Com 1st Semester BBA 1st Semester BCA (D) 1st Semester Bsc. IT (D) 1st Semester Bsc. IT 1 1st Semester M.Tech 1st Semester MCA 1st Semester MCA (D) 2nd Sem B.Com 2nd Sem BB 2nd Sem BBA 2nd Sem BCA 2nd Sem BCA (D) 2nd Sem BSC IT(D) 2nd Sem BSC(IT) 2nd Semester MBA A Foundation Course in Human Values and Professional Ethics ACCOUNTING FOR MANAGEMENT ADVANCE SOFTWARE ENGINEERING ADVANCED COMMUNICATION SYSTEMS ADVANCED MATHEMATICS FOR ENGINEERS Accounting and Financial Management Accounting and Financial Managementm Adolescence And Family Education B.Ed (Dec 2013) Adolescence And Family Education B.Ed (Dec 2014) Adolescence and Family Education B.Ed (2012) Advanced Accounting 2 Aligarh Muslim University Applied Physics 1 B.Ed (Dec 2008) B.Ed (Dec 2009) B.Ed (Dec 2011) B.Ed (Dec 2012) B.Ed (Dec 2013) B.Ed (Dec 2014) B.Ed (June 2008) B.Ed (June 2009) B.Ed (June 2015) BA 1 Syllabus BBA 1 BBA 2 BCA Question Papers BCA Syllabus 1 Bachelor in Science Fashion and Technology Basic Accounting Basic Chemistry Basic Electrical Engineering Basic Electronics Basic Mathematics BSC 1 Basoc Accounting Bridge Course in Mathematics Bsc.IT Business Communication-1 Business Communication-2 Business Communication-I 2 Business Environment 2 Business Laws 1 Business Mathematics Business Organisation and Management Business Statistics 2 C C Programming C Programming Bsc IT 1 C Programming Lecture Videos CADM 1st Semester Communication 2 Communication Skills Communication Skills 1 Communication and Soft Skills Communicative English Computer Applications Computer Fundamental Computer Graphics Video Lecture Computer In Education B.Ed (Dec 2013) Computer Mathematical Foundation MCA D Computer Networks 1st Semester Computer Operating System Computer Organization and Assembly Language Computer System Architecture 2 Computer and Education B.Ed (Dec 2011) Computer and Education B.Ed (Dec 2012) Computer in Education B.Ed (Dec 2008) Computer in Education B.Ed (Dec 2009) Computer in Education B.Ed (Dec 2014) Corporate Accounting Curriculum and Instruction B.Ed (Dec 2009) Curriculum and Instruction B.Ed (Dec 2011) Curriculum and Instruction B.Ed (Dec 2012) Curriculum and Instruction B.Ed (Dec 2013) Curriculum and Instruction B.Ed (Dec 2014) Curriculuman and Instruction B.Ed (Dec 2008) DATA COMMUNICATION NETWORK Data Structure 2 Data Structures 2 Data Structures Through C 2 Database Management with Microsoft Access Bsc IT 1 Delhi University News Desktop Publishing Tools 2 Digital Circuits and Logic Design 2 Digital Circuits and Logic Design 2 BCA D Digital Electronics 2 Digital Electronics Fundamentals 2 Distance Education B.Ed (Dec 2008) Distance Education B.Ed (Dec 2009) Distance Education B.Ed (Dec 2011) Distance Education B.Ed (Dec 2012) Distance Education B.Ed (Dec 2013) Distance Education B.Ed (Dec 2014) Dot Net Interview Questions & Answers. ELECTRONICS SYSTEM DESIGN Education Technology B.Ed (Dec 2009) Education and Evaluation B.Ed (Dec 2009) Education and Society B.Ed (Dec 2008) Education and Society B.Ed (Dec 2009) Education and Society B.Ed (Dec 2011) Education and Society B.Ed (Dec 2012) Education and Society B.Ed (Dec 2013) Education and Society B.Ed (Dec 2014) Educational Evaluation B.Ed (Dec 2008) Educational Evaluation B.Ed (Dec 2011) Educational Evaluation B.Ed (Dec 2012) Educational Evaluation B.Ed (Dec 2013) Educational Evaluation B.Ed (Dec 2014) Educational Technology B.Ed (Dec 2008) Educational Technology B.Ed (Dec 2011) Educational Technology B.Ed (Dec 2012) Educational Technology B.Ed (Dec 2013) Engineering Drawing and Graphics Engineering Mathematics Engineering Question Paper set 1 Engineering Syllabus English and Communication Skills English and Communication Skills 2 Environmental Science 2 Finaicial Accounting Financial Accounting Financial Management 2 Sem Fundamentals of Information Technology Bsc 1 Guidance and Counseling B.Ed (Dec 2008) Guidance and Counseling B.Ed (Dec 2011) Guidance and Counseling B.Ed (Dec 2012) Guidance and Counseling B.Ed (Dec 2013) Guidance and counseling B.Ed (Dec 2009) HIV and Aids Education B.Ed (Dec 2011) HIV and Aids Education B.Ed (Dec 2012) HIV and Aids Education B.Ed (Dec 2013) HP University News Hotel Management and Air Lines Syllabus Human Resource Management Human Resource Management 2 Information Management Information Technology for Management Intoduction to microprocessor 2 BCA D Introduction of Computers BBA1 Introduction to Computers 2 Introduction to I.T MCA D Introduction to Information Technology Introduction to Information Technology(BCA) Kurukshetra University News Lecture 20 Clipping -- Lines And Polygons MBA Papers MCA Notes MCA Question Papers Macro Economics 2 Management Syllabus Managerial Economics Marketing Management 2 Master Of Technology M-Tech Syllabus Mercantile Law 2 Metal Cutting Question Paper Metal Forming Question Paper Micro Economics NEURAL NETWORKS & FUZZY LOGIC Network Security OOP CPP 2 Object Oriented Programming in C++ Object Oriented Programming in Cpp Operating System Bsc IT 1 Operating system (BCA) Organisational Behaviour Organization Behaviour 2 Other Universities Others PCM 2 BCA D PGDCA PTU Affiliated Colleges of Integerated College PTU Affiliated Colleges of Management College PTU Affiliated Colleges of Architecture PTU Affiliated Colleges of Engineering PTU Affiliated Colleges of Pharmacy College PTU Forms Download PTU News and Events Panjab University News Pharmacy Syllabus Principles and Practices of Management Production and Operations Management 2 Programming Logic Development with C Programming in C Programming in C MCA D Psychology of Learning and Development B.Ed (Dec 2013) Psychology of Learning and Development B.Ed (Dec 2008) Psychology of Learning and Development B.Ed (Dec 2009) Psychology of Learning and Development B.Ed (Dec 2011) Psychology of Learning and Development B.Ed (Dec 2012) Quantitative Techniques RDBMS 2 RDBMS-I 2 Relational Database Management System Research Methodology 2 SAD 2 BCA D Syllabus of Computer Applications Syllabus of Journalism and Mass Communication Syllabus of Medical Laboratory Science System Analysis and Design System Analysis and Design 2 System Analysis and Design MCA D Teacher and School B.Ed (Dec 2008) Teacher and School B.Ed (Dec 2009) Teacher and School B.Ed (Dec 2011) Teacher and School B.Ed (Dec 2012) Teacher and School B.Ed (Dec 2013) Teacher of English B.Ed (Dec 2009) Teaching of English B.Ed (Dec 2008) Teaching of English B.Ed (Dec 2011) Teaching of English B.Ed (Dec 2012) Teaching of English B.Ed (Dec 2013) Teaching of Mathematics B.Ed (Dec 2009) Teaching of Mathematics B.Ed (Dec 2011) Teaching of Mathematics B.Ed (Dec 2012) Teaching of Mathematics B.Ed (Dec 2013) Teaching of Science B.Ed (Dec 2008) Teaching of Science B.Ed (Dec 2009) Teaching of Science B.Ed (Dec 2011) Teaching of Science B.Ed (Dec 2012) Teaching of Science B.Ed (Dec 2013) Teaching of Social Studies B.Ed (Dec 2008) Teaching of Social Studies B.Ed (Dec 2011) Teaching of Social Studies B.Ed (Dec 2012) Teaching of Social Studiess B.Ed (Dec 2013) Teaching of Social Study B.Ed (Dec 2009) Technical Communication UGC NET Computer Science Question Paper Uttarakhand Open University Video Lecture Web Technologies 1st Semester Web Technologies 2 Welding Technology Question Paper Workshop on IT and E-Commerce 2 data structures 2 BCA D principles of management 2