Roll No_________
WATER SUPPLY AND
WASTE WATER ENGINEERING
4th
Exam /Civil/5165/May’08
Duration 3 Hrs.
1.
Choose the correct one
a.
The valve provided at all dead ends in the
distribution system & at all depressions is
i.
Safety valve
ii.
Sluice valve
iii.
Scour valve
iv.
Float valve
b.
The pH value of neutral water is
i.
5.0
ii.
6.0
iii.
7.0
iv.
8.0
c.
The pipe through the water main to building is
i.
Water service pipe
ii.
Soil pipe
iii.
Waste pipe
iv.
Vent pipe
d.
Which of the followings is an hydraulic element
of a sewer
i.
Dameter
ii.
velocity
iii.
slope
iv.
all of the above
state true or false.
a.
Pipe which carries sewage is called sewer.
b.
Anaerobic bacteria act in the presence of oxygen
c.
Recirculation is canaries out in trickling
filter.
d.
Maximum daily demand is less than average daily
demand
e.
Algae produces colour and odour in water
Fill in the blanks
a.
The unit of hardness is _____
b.
Pipe used in building is _______ pipe.
c.
Sedimentation removes _______
d.
Oxidation is the addition of oxygen or removal
of _______
e.
BOD stands for _______
Section
–B
Note : Attempt any ten questions
2.
a.
What is conservancy system of sanitation ?
b.
What are maximum and minimum velocities of
sewers?
c.
Give the locations & functions of a manhole
d.
Explain a
collar joint.
e.
What is a seal? How it gets broken?
f.
Explain self purification of stream.
g.
Write per capita consumption of various demands
of water as per BIS standards.
h.
What are sub surface water sources.
i.
What is standards plate count test?
j.
How pipe lines are tested?
k.
What are water supply fixtures ?
l.
Explain hardness of water
Section-C
Note : Attempt any three questions.
3.
Define coagulation. Explain different types of
coagulates used
4.
Explain different methods of layout of
distribution pipes
5.
Explain the construction and working o tricking
filter.
6.
Explain the methods of sludge digestion and
sludge disposal
0 comments:
Post a Comment
North India Campus