QI)
a) Operation
Management.
b) Process
layout.
c) Plant
location.
d) 'Master
production schedule.
e) Line
Balancing.
f) Inventory
control for single product.
g) Job-shop.
h) Machine
Loading.
i) Gantt
scheduling chart.
j)
Job-sequencing for Men and Machines.
Section - B
Q2)
Distinguish in clear terms between Mass Production, Batch Production and
Unit Production.
In what ways production planning and control system differ between three types?
Explain with examples.
Q3)
(a) Discuss briefly both Qualitative and Quantitative factors which are kept
in mind before
locating any plant-site useing examples.
(b) A factory working
in two shifts each of 8 hours produces 24,000 electric bulbs using a set of
work stations. Compute the actual time of plant operation, if 8 tasks are
required to manufacture the bulb and sum of all task times is equal to 12
seconds. Assuming feasibility of combining tasks into work stations,
calculate
the number of work stations to maintain this level of production.
Q4)
(a) Explain critical elements of
Aggregate production planning and its
importance. Also describe one technique of Aggregate
production
planning with an example.
(b)
Distinguish between process and
product layout using suitable examples.
Q5)
The XYZ company is in the process of updating its master production
schedule (IVPS) for its
production. The plant produces on produce to stock basis. The manager has
collected the following data for the next six weeks.
Weeks
Demand for
product 1 2 3 4 5 6
Customers 500 1000 500 200 700 1000
Branch Warehouse 200
300 400 500 300 200
Market Research 50 10
Production
Research 10
The safety stock K,
minimum production lot size and beginning in venture are 1500, 400 and I 120
units, respectively. Prepare a six week MPS assuming sufficient production
capacity.
Q6)
(a) Explain briefly the Inventory control management for single product as
well as for multiple
products with examples.
(b)
Six jobs require the use of two machines in the order M1, × M2,
ir a job shop. Time on each machine for each job is given below, work out the optimal
sequence of jobs that minimises the total elapsed time.
Jobs
1 2 3 4 5 6
M1 12
7 10 14 4 5
M2 8 10 6 9 11 9
Q7)
Write brief note on the following (Any Two) :
(a)
Modular Design.
(b)
Service Process Matrix.
(c)
Assembly line Balancing.
(d)
Production organization structure.