Roll no ....................
Total No. of Questions: 07]
Paper ID [MB642]
MBA(Sem.-3rd
& 4th )
PRODUCTION
PLANNING & CONTROL(MB-522/642)
TIME: 03 Hours 
Instruction to Candidates :
1)   
Section – A is
Compulsory.
2)   
Attempt any Four
questions form Section – B.
Section - A
QI)
a) Functions of
Prosecution Planning and Control.
b) Organisation
structure for production Deptt.
c) Process Charts.
d) Aggregate Planning
Process
e) Material Requirement
Planning.
f) Gantt Scheduling
Chart.
g) Menthols of Line
Balancing.
h) Limited Scheduling
Systems.
i) Distinguish between
Job Shop and Project
j) Operation Capacity
Planning.
Section - B
Q2)
Name various types of Production Systems and give chief characteristics
features of each
system.
Q3)
The main post office in a city is to be replaced by a new site that can handle the
tremendous increase in flow of mail in an efficient manner. Since all mail, incoming
and outgoing, travels from the six sub-post offices through the main Post
office, its site location can mean a big difference in overall delivery and (movement
efficiency. Determine the site location using the following data with (a)
Median Method and (b) Gravity Method.
Sub
Post Office :  A       B       C       D       E       F
(X,
Y) Map Coordinate
(km)                               (10,5)                   (3,8)  (4,7)  (15,10)        (13,3)                   (7,14)
Truck
Load
Trips/day             3                 3        2        6        5        4        
4)
     Discuss briefly the objectives,
functions and techniques of production, planning and control with special
reference to batch type of production system.
Q5)
The computer product corporation is in the process of updating its Master
production
schedule (MPS) for its products. The plant produces on produce
to stock basis.
The manager has collected the following data for the next six weeks.
Demand for
Scanners        1    2        3        4        5        6
Customers                         500          1000  500    200    700    1000
Branch Warehouse            200          
300   400    500    300    200
Market Research                               50                10
 Production
Research           10
Production
Research           10
Safety stock,
Minimum Lot size and Beginning Inventory are as follows
Minimum Lot 1500, Safety stock = 400 and beginning
inventory 1120.
Prepare a six weeks, MPS assuming sufficient
production capacity.
6)
(a) Six jobs require the use of two machines in the order M, x M, in a job
shop. Time (in hrs) on each machine for each job is
given below. Work
out the optimal sequence of jobs that minimizes the
total elapsed time
                                                  Jobs
J1       J2       J3       J4
      J5       J6
M1     12
     7        10      14      4        5        
M2     8        10      6        9        11      9
 (b) Write
brief note on Just IN TIME technique.
7)
Write brief note on the following :
(a) Inventory Control
Models.
(b) Material
Requirement Planning.
(c) Product Selection.